Now accepting early access applications

Stop Losing Weeks to
Permit Rejections

Approvai pre-checks commercial rooftop solar permit packages for the AHJs your team actually submits to most — flagging likely rejection reasons before you submit. We start focused and get smarter with every returned comment.

Every AHJ plays by different rules.
Your team is paying the price.

📋

Inconsistent Requirements

Each Authority Having Jurisdiction has its own checklist, document formats, and technical standards. What passes in Phoenix gets rejected in Sacramento.

🔄

Endless Back-and-Forth

Permit technicians spend hours resubmitting the same package with minor corrections. Every cycle burns engineering time and stalls your project timeline.

📉

Revenue Left on the Table

Delayed interconnection means delayed commissioning. Each week of slippage compounds into missed incentive windows and unhappy clients.

🧠

Tribal Knowledge at Risk

Your best permit expediter holds years of AHJ-specific knowledge in their head. What happens when they leave?

Your AI permit reviewer, available 24/7

01

Upload Your Package

Drop in your permit drawings, single-line diagrams, equipment specs, and site plans. Approvai accepts the same formats you already use.

02

Select Your AHJ

Choose from our supported jurisdictions. We launch with a focused set of high-volume AHJs and expand based on where our users actually submit — so coverage grows with real demand.

03

Get a Pre-Flight Report

Receive a detailed review within minutes: flagged issues ranked by severity, specific corrections needed, and references to the exact code section or AHJ requirement.

04

Submit with Confidence

Fix the flagged items, re-run the check, and submit knowing your package meets requirements. First-pass approval becomes the norm, not the exception.

Built for commercial solar permit teams

How We Build Coverage

Three Layers of AHJ Knowledge

We don't pretend one checklist covers everything. Approvai builds coverage in layers so the rules we apply are grounded in reality, not guesswork.

  • Layer 1 — Shared rules: package components, labeling, electrical single-line requirements, fire pathways, and structural callouts that repeat across jurisdictions
  • Layer 2 — AHJ profile: required documents, submission portal quirks, named forms, fee references, and commercial-vs-residential differences for each supported jurisdiction — sourced from public permit pages and checklists
  • Layer 3 — Reviewer feedback: when a reviewer sends comments back, those get ingested as new rules — this is how we close the gap between published requirements and actual rejection behavior
Analysis

Document-Level Review

Approvai reads your actual uploaded drawings — not just a metadata form. It checks for labeling errors, missing callouts, and inconsistencies across sheets.

Scope

Commercial Rooftop PV, Done Right

V1 is focused on commercial rooftop solar PV — no storage, no ground-mount. A narrower scope means deeper, more reliable coverage for the package type your team submits most.

Learning Loop

Gets Smarter With Every Rejection

When a reviewer sends comments back, paste them in. Approvai converts real rejection language into new rules — so the same miss never gets past us twice.

Roadmap

Coverage Expands With You

Early access users directly shape which AHJs we add next. The jurisdictions your team submits to most become our next build target.

Built with early users,
not after them

We're looking for commercial solar EPCs and permit expediters who submit to the same AHJs repeatedly and are tired of the same rejections. Early users shape the product — which AHJs we cover, which rules we build first, and how the report is structured.

  • Founding member pricing locked in for life
  • Direct input on which AHJs we prioritize
  • Early access before public launch

Request Early Access

No spam, ever. Unsubscribe anytime.